IT之家 · IT业界T2·72 pts
- 18A yield rose to 70 percent from the low point when Lip-Bu Tan took over in March 2025, improving advanced-node manufacturing economics
- 18A already ships in Panther Lake Core Ultra 300 and the up-to-288-core Clearwater Forest Xeon 6+, the latter using Foveros Direct 3D packaging
- 14A PDK 0.9 is with customers, PDK 1.0 is set for Q1 2027, risk production for H2 2027 and volume ramp in 2028
- A single yield figure does not capture true cost for multi-chiplet parts, which also depend on parametric yield and sellable product mix