IT之家 · 智能时代T2·68 pts
- Over $24B invested across 444 acres, with multiple buildings topped out within 90 days
- 35 gas turbines totaling 750 MW deliver on-site power without drawing on the public grid
- Tesla Megapack storage arrays already installed, estimated at over $250 million